A large logistics centre realised efficiently
The premises of the logistics centre were designed to match the customer’s needs. Office premises were also added to the approximately 50,000 m² warehouse building and approximately 10,000 m² terminal building. The warehouse building features ceiling sprinklers. The floor area of the head office is approximately 3,000 m², and its surface materials were harmonised with other DSV country offices. Large truck yards were also constructed at the site to cater for the needs of heavy traffic.
Also this logistics centre made use of roof panels fabricated at our Humppila factory. Dimensioning the proprietary roof elements for the frame is easy and efficient, which made it possible to efficiently optimise the frame system and sprinkler.
Thanks to the use of prefabricated roof panels, the roof structure could be closed quickly, which, in addition to efficiency, added weather production for other work phases. The large site employed over 100 motivated construction professionals every day. The construction time of the property was approximately 13 months.