Diverse Facility Solutions
The building has 2,700 square metres of office space, a 2,900 m2 hall and a 300 m2 maintenance building. The clear ceiling height of the hall area is 10.2 metres and it also contains the staff gym partly taking up two floors.
The project was implemented efficiently. The contract negotiations began in 2013 and the building was completed and ready for use in the first half of 2015. Since then, the property has been used by a very satisfied operator. The construction period was approximately 12 months and the main designer was our architect Pekka Pettinen.
The main building is comprised of a three-floor office facility and a tall production hall. The hall and the maintenance building have a steel structure and are covered with elements of sheet metal with wool in between. The pillar-beam frame of the office facility is made of concrete, the floor structures are cavity slabs and the facades are partly supporting thin-layer plastered elements.